2013 Renewal and Replacement Projects

1019 Dana Avenue

Full demolition of eight bathrooms.  Installation of new floor joists, toilets, sinks, shower stalls and ceramic tile on walls and floors.

Corcoran Soccer Field - 2013

Removal of six HID lights and light poles.  Installation of four new poles.

Joseph Hall Montessori Expansion

Fireproofing the deck, installation of new ceilings, installation of new fireproof doors with card access and installation of shaft walls.

Kuhlman Hall

A Mechanical renovation to Kuhlman Hall will include the addition of a new Energy Recovery Ventilator which will solve negative air pressure problems, and utilize the temperature of the building exhaust air to temper outside air before entering the building, resulting in energy savings.  Fire Alarm systems will be upgraded to meet current codes, including smoke detectors in every living space and mass notification capabilities.  Existing public area lighting will be replaced with high efficiency light fixtures, and occupancy sensors.  The air and light work above ceilings will mandate that corridor ceilings get replaced with new.  It is also anticipated that mobile phone antennas will be installed on the roof by an outside vendor during the period of mechanical renovation.  A more detailed Architectural Finishes renovation to the interior materials is anticipated in following years.

 

Wayfinding - Phases 2 and 3

Installation of vehicular directional signs, pedestrian directional signs, parking and regulatory signage as well as campus maps and kiosks.