Past Projects

2012

Please click on the following link to view a campus map of 2012 projects: 2012 Renewal and Replacement Projects.

Asphalt Paving

Resurfaced O'Connor A, B and C, South, Elet, Joseph, and Alumni parking lots. Resealed the Sycamore parking lot.

Corcoran Soccer Field - Turf

Replaced 12 inches of stone under the existing turf for proper drainage. Installed 96K square feet of field turf.

Corcoran Soccer Field - Sidewalk

Dug out old blacktopped sidewalk and installed Allen block retaining wall. Poured new concrete sidewalk.

Gallagher Student Center

The Gallagher Student Center is nine years old and has been operating a 24/7 schedule for the last few years. As a result, the building is in need of restoration.

Cleaned, caulk, tuck point and sealed Gallagher tower front and back of the building. Replaced vista wall doors with new Kwaneer doors.

Hinkle Hall Renovation

95 offices, 3 conference rooms, and all public spaces in Hinkle Hall received upgrades over the summer of 2012. This included new office paint and carpet, hallway floor tile, and all woodwork was sanded and varnished. Faculty packed up their offices for a 7 phase renovation. Stairs, lobby, and faculty lounge were also upgraded.

Cleaned the stone entrance way.

Replace EIFS (dryvit) on stairwells

O'Connor Sports Center - Parking Lot

Had to grind down 2 inches of black top and resurface it with 2 inches of black top for positive drainage on 3 parking lots.

Residence Hall Chapels

The chapels located within Kuhlman Hall and Buenger Hall have been refreshed wih some new finishes including paint, carpet, and furniture.

Schmidt Hall 3rd Floor Renovation

Renovation of the Senior Vice President and CFO office area and Budget office. New location for the Vice President for Financial Administration. Relocation of copy room and kitchenette. New conference room for the division and building use. New carpet and paint finishes in existing office areas.

Schott Hall Parapet

Grind out joints and tuck points on interior and exterior parapet wall next to the cell tower.

Walk of Champions

Removed curb and blacktop. Reinstalled concrete walk-way, grass pavers, and landscaping.

Wayfinding - Phase 1

Replacement of building identification signage throughout campus.

 

2011

Academic Mall Piping

The Academic Mall Piping project entails replacement of all hot water (heating) and chilled water (cooling) piping along the length of the Academic Mall. The project began and continued while classes were in session and was scheduled to be completed by August 1, 2011.

McDonald Library Renovation