Sewer Line Repair

June 20, 2011 | June 20, 2011

A small break has been detected in a sewer line near the traffic exit from the lower Gallagher parking lot to Victory Parkway. Work to repair the break is scheduled to begin tomorrow (Tuesday, June 21). It will take several days to repair the line. At this time, the exit will remain open to traffic but will be restricted to one lane. If it becomes necessary to block the exit after the initial excavation, University Drive will become two-way. Thank you for your patience.